Production deploys blocked by "run out of credits" — 27.4/30 credits available (Free plan)

Hi team,

Our production deploys are being skipped with “Skipped due to account credit usage exceeded”, but our credit balance is not zero — the billing page shows 27.4 / 30 credits remaining.

Account details

  • Team: Cogumelu (Free plan)
    • Account email: cogumelucriativo@gmail.com
      • Site: nobra.netlify.app
        • Top banner: “Cogumelu has run out of credits — Your sites may go offline and production deploys and Agent Runners are currently disabled.”
          1. With the banner active, does an already published site keep serving normally, or will it actually go offline? The wording says “may go offline” and I need to know the real behaviour, since this is a client-facing site.
            1. Do deploy previews (non-production branches) still work while the flag is active, and do they consume credits? The plan description says previews are unlimited.
          2. Thanks!

I’m experiencing the same issue on another Free-plan team.

  • Team: topspot4077

  • Current billing period: June 30 through July 29

  • Dashboard shows: 30 credits available

  • Banner says the team has run out of credits

  • Production deploys are disabled

  • A production update has already been merged into the main branch and is waiting to deploy

Please include this team in the investigation and clear the stale credit-usage flag so the available credits can be used for the production deployment.

Thank you.